River Elementary School Outreach Page
Carmel Area Wastewater District is conducting a project to replace 75+ year old sewer pipes in the vicinity of Carmel River School. Please plan to avoidconstruction areas when travelling to and from school:


Scenic Rd Sewer Replacement Project
Overview
The project would replace existing District sewer mains. The project includes the installation of a total of 10,561 linear feet (LF), or approximately 2.0 miles, of pipelines installed in place of existing pipes. The pipelines would be constructed via pipe bursting and open trench excavation. All excavation would be within roadway right-of-way and District easements within soils that were previously disturbed during installation of the existing pipeline. There are existing sewer laterals located along the project alignment that connect each home to the sewer main. A total of 235 lateral reconnections would be completed on streets where sewer line replacement would occur. The purpose of the project is to replace aging wastewater infrastructure and improve the long-term reliability of the wastewater system.
Project Benefits
- Replace 75+ year old failing sewer mains
- Reduce risk of sewage leaks and spills
- Improve long-term reliability of the wastewater system
- New private lateral wye connections
Project Status
The contractor has been selected and construction is anticipated to begin in early fall 2025. Construction will extend through to late summer 2026. The work on Scenic Rd between 8th and 13th is being scheduled for January/February 2026 when Carmel beach is less busy.